Project 1: Murphy, April. 1 - April. 2nd (8209 John St.) (Spencer)

Description

Project 1: Murphy/Morris family 4.1 & 4.2 / Finish; Only 2-day project.

April 3rd Holiday - Good Friday

This family has lived in their home for 15 years and has reached out to us for help. We have started work at this home, but we still need volunteers to finish up their list of work.

The full list of work includes replacing ten windows, repairing subflooring in the kitchen and bathroom, and installing new vinyl flooring in those areas. We’ll also add handrails at the front and back entrances, convert a tub into a walk-in shower with grab bars, replace kitchen and bathroom faucets, update ceiling fans, make drywall repairs, and service the HVAC system, including vent repairs or replacements as needed.

Location

Get Connected Icon 8209 John St.
Spencer , OK  73084

Shifts

Begins Duration Open Spots Sign-up
Wed Apr 1, 2026 @ 8:00am
to 3:00pm CT
7.00 hours 10 of 10
Thu Apr 2, 2026 @ 8:00am
to 3:00pm CT
7.00 hours 8 of 10